I was able to get up to the park today for a quick photo update! As mentioned, all the track is installed from the brakes up to the lift including the transfer track and all the maintenance bays. Full set of pictures can be found in our construction gallery here:
http://www.cwmania.com/gallery/thumbnai ... =1&sort=dd
More supports being dropped off.

The trench for the valley of the first drop.

Another angle of the trench looking back towards the station area.

More footers and lots of track and supports. The tallest track pieces for the lift are around 7 feet tall!

Many more footers are complete along the west side of the parking lot.

Digging more footers near the front gate.

Front gate entry plaza.

Not much has changed here since our last update...

A LOT has changed up here though.

The transfer track & maintenance bays have been installed.

Transfer track.

Maintenance bays.

As mentioned in the official blogs, a lot of the electrical has been done.

Base of the lift.

Lift and crane.

This is the general area Leviathan's entrance will be located (across from the shop).

The bottom of this picture (the large mound of dirt) is the former large planter that will be the future entry plaza for Leviathan.